Sewer work and retaining wall work is ongoing. Utility relocations are ongoing and will continue for several weeks.
As a reminder, while road work continues, construction crews and vehicles will be present in the area. Two-way traffic will be maintained whenever possible, but motorists should expect periodic delays. The bridge remains open to both vehicles and pedestrians at this time. Please use caution when traveling through the work zone and follow all posted signs and the direction of flaggers.
For more information about this project, please visit LebanonNH.gov/DryBridge.
Sewer work and retaining wall work is ongoing. Utility relocations are ongoing and will continue for several weeks.
As a reminder, while road work continues, construction crews and vehicles will be present in the area. Two-way traffic will be maintained whenever possible, but motorists should expect periodic delays. The bridge remains open to both vehicles and pedestrians at this time. Please use caution when traveling through the work zone and follow all posted signs and the direction of flaggers.